Skip to main content.

Water Details

 

Description

Format

Revision Date

2 inch Water Service Connection and Meter Box Installation

 

 

10/10/2008

Check Valve in Precast Utility Vault

 

 

10/10/2008

Cutting-In Sleeve and Valve Installation

 

 

11/24/2008

Permanent 2 inch Valve and Blowoff Detail

 

 

03/08/2011

Service Connection Without Meter

 

 

04/13/2010

Temporary 2 inch Valve and Blowoff Detail

 

 

03/08/2011

Tracing Wire Installation Detail

 

 

05/23/2011

Typical Detail Ditch Crossing

 

 

06/26/2009

Typical Detail Fire Hydrant with Valve and Box for Drainage Crossing

 

 

06/26/2009

Typical Detail Fire Hydrant with Valve and Box

 

 

04/14/2011

Typical Detail Post Hydrant with Valve and Box

 

 

08/07/2009

Typical Detail Tapping Sleeve and Valve

 

 

08/07/2009

Typical Detail Valve and Valve Box Installation

 

 

04/14/2011

Valve and Line Marker Detail

 

 

06/26/2009

Water Air Release Valve

 

 

10/10/2008

Water Main Trench Detail

 

 

10/10/2008

Water Note

 

 

10/18/2011